HOTEL MARRIOTT TIRANA – IMPLEMENTATION OF FIRE DETECTION SYSTEM

Year: 2022

Client: Albstar

Elteknik has implemented the Fire Detection System for the Marriott Hotel in Tirana. The Marriott Hotel is part of the Air Albania stadium and Arena Center complex. The fire detection system provides protection according to contemporary fire detection standards for all hotel premises.

The services provided by Elteknik for this project include

Implementation of:

  • Fire Detection System with point detectors for rooms and other service areas
  • Fire Detection System with Aspirating Smoke Detectors for technical shafts, elevators, etc.
  • Fire Detection System with Linear Temperature Detectors for underground parking spaces.
Read more

PRADO LUXURY RESORT – IMPLEMENTATION AND DESIGN OF ELECTRICAL SYSTEMS

Year: 2021-2022

Client: PRADO LUXURY RESORT

Elteknik has designed and implemented electrical systems for Prado Luxury Resort in Livadh, Himare. Prado Luxury Resort is a hotel with 57 rooms located on Livadh Beach in Himare, developed as a resort that will offer hotel services of the highest level. The project also includes common service areas such as restaurants and bars, SPA center, gym, conference rooms, outdoor pool, underground parking, etc.

The services provided by Elteknik for this project include

Design and Implementation of:

  • Electrical Substation, Transformers and MV Switchgears
  • Generators and UPS
  • Main Supply Switchboards and Distribution Switchboards
  • Cable trays and infrastructure for electrical installations
  • Power installations
  • Lighting System
  • Data Network
  • Lightning Protection System
  • Emergency Lighting System
  • Fire Detection System
  • Audio and Voice Evacuation System
  • Video Monitoring System
  • BMS system
  • Hotel Room Management System
Read more

HOTEL ROGNER – DESIGN AND IMPLEMENTATION OF ELECTRICAL SYSTEMS

Year: 2015-2016, 1993-1995

Client: Hotel Rogner

Elteknik has designed and implemented electrical systems for the expansion of Hotel Rogner and the New Conference and Events Center in Tirana, Albania in 2016 and Implementation Works for electrical systems during the construction of Hotel Rogner in 1993-1995.

The services provided by Elteknik for this project include

Design and Implementation of:

  • Main Supply Switchboards and Distribution Switchboards
  • Cable trays and infrastructure for electrical installations
  • Power installations
  • Lighting System
  • IT Data Network and Telephone Network
  • Lightning Protection System
  • Emergency Lighting System
  • Fire Detection System
  • Public Announcement and Voice Evacuation System
  • Access Control System
  • Video Monitoring System
  • Audio and Video Management System and Lighting Management System for Conference Halls
Read more

AIR ALBANIA STADIUM – IMPLEMENTATION WORKS FOR THE ELECTRICAL SUBSTATION

Year: 2019

Client: Albstar

Elteknik has implemented the works for the electrical substation at the Air Albania Stadium in Tirana in 2019. The new stadium in Tirana was built to serve as a National Arena for the Albanian Football Federation and is a modern stadium according to UEFA standards that includes, beside the sport facilities, some service areas, commercial areas, offices, hotel, underground parking, etc.

The services provided by Elteknik for this project include

Implementation of:

  • Electrical implementation works for the Electrical Substation of the stadium
Read more

PARK AT “ELBASANI STREET” AND UNDERGROUND PARKING – DESIGN OF ELECTRICAL SYSTEMS

Year: 2017

Client: Dea Studio

In 2017, Elteknik carried out the design of the electrical systems for the Park Reconstruction project on Elbasan Street and Underground Parking in Tirana. The project includes the design of all the necessary electrical infrastructure, the lighting of the park and public spaces, as well as all the electrical systems necessary for the underground parking.

The services provided by Elteknik for this project include

  • Electrical Substation, Transformers and MV Switchgears
  • Generators and UPS
  • Main Supply Switchboards and Distribution Switchboards
  • Cable trays and infrastructure for electrical installations
  • Power installations
  • Lighting System for the public spaces
  • Lighting system for underground parking areas
  • Data Network
  • Emergency Lighting System
  • Fire Detection System
  • CO Detection System for Parking
  • Public Announcement and Voice Evacuation System
  • Access Control System
  • Video Monitoring System
  • Sistemin e Menaxhimit të Parkimit
  • Parking management system
Read more

HOTEL MELIA – SAN PIETRO RESORT – DESIGN OF ELECTRICAL SYSTEMS

Year: 2019-2020

Client: Concord Investment

Elteknik has designed the electrical systems for the Melia Hotel in San Pietro Resort in Lalzi Bay, Albania. Hotel Melia is a 5-star hotel in Lalzi Bay with a total capacity of 478 rooms of the international brand of Melia Hotels. The project also includes other service spaces including conference rooms, restaurants, bars, SPA center, indoor and outdoor swimming pools, etc.

The services provided by Elteknik for this project include

Design of:

  • Electrical Substation, Transformers and MV Switchgears
  • Generators and UPS
  • Main Supply Switchboards and Distribution Switchboards
  • Cable trays and infrastructure for electrical installations
  • Power installations
  • Lighting System
  • Data Network
  • Telephone System
  • TV-SAT System
  • Lightning Protection System
  • Emergency Lighting System
  • Fire Detection System
  • Audio and Voice Evacuation System
  • Video Monitoring System
  • BMS system
  • Hotel Room Management System
Read more